Description | With reference to Cohen's concern about the possibility of further damage being done to the steps in removing the dynamo, Rix is willing that Cohen defer the steps until the heavy work has been done, but he cannot allow the dynamo to be removed until the window has been done. The Board of Works has discovered the damage and require them to have it properly repaired. It would be a great convenience if Cohen could move the dynamo for the present. |