Description | Present: Mr M O Robins, Chairman; Dr E B Dorling; Mr J Hugill; Dr R C Jennison; Dr F G Smith; Dr K H Stewart Mr D E Miller (Meteorological Office) attended by invitation
1. Minutes The minutes of the meeting held on 17 November 1960 (NCSP/162(60)) were confirmed
2. Discussions with Mr A G Ferris
3. Visits to NASA
4. Data Handling Reports
5. Experimental Payload of UK - S.II
6. Recent discussions with NASA
7. UK Action required before US - UK Working Group Meeting 7a Allocation of Telemetry Channels - the Group considered the 3 proposals for the use of the telemetry channels (see Appendix I) 7b High Speed and Low Speed Encoders 7c. Synchronisation 7d Spin Data and Axis Inclination 7e Structural Packaging
8. Medical Expenses
9. Import and Export of Materials
10. Date of next meeting It was agreed to hold the next meeting of the Working Group at 2.15pm on 27 April 1961. |