Description | Present: Mr J A Ratcliffe, Chairman; Professor C WAllen; Mr W T Blackband; Dr A H Cook; Dr E B Dorling; Dr J S Hey; Mr P B N Nuttall-Smith; Dr BGPressey; Mr M O robins; Dr R LSmith-Rose Mr G W Luscombe attended by invitation
1. Minutes
2. Data Handling in the UK [NCSP/40(61)] Section I - Purpose of the Memorandum Section II - Technical Facilities required Section III - Present Proposalsconcerning Scout I Section IV - Considerations involved in setting up processing and computing facilities in the UK Section V - Detailed proposals Section 6 - Cost and Facilities required
3. Matters arising from the Minutes 3a Minute 3(c) - Minitrack Installation at Winkfield 3b Minute 3(d) - Joint Satellite Computing Programme 3c Minute 5 (a0 - Orbit AnalysisWorking Group 3d Minute 6 (c) - Telemetered Data Reception 3e Minute 6(d) - Data Reduction 3f Minute 7 - Allocation of Radio Frequencies 3g Minute 8 - European Tracking
4. Working Group Minutes 4a Joint Meeting 4b Tracking 4c Telemetry 4d Ionosphere
5. Reorganisation of Working Group
6. COSPAR Matters
7. Membership
8. Date of Next Meeting It was agreed that the next meeting of the Subcommittee should be held when matters arising out of the activities of the Working Groups made this necessary. ' |